ALERTS
ROAD CLOSURE — CR 14 (Ridgeline Rd) between MM 4.2 and MM 7.8 closed for culvert replacement through March 14WINTER MAINTENANCE — Chain control in effect on Hwy 9 above 7,200 ft · Carry traction devicesPERMIT OFFICE — Oversize load permits require 48-hr advance notice · Call (719) 555-0140BRIDGE INSPECTION — Pine Creek Bridge (BR-047) weight limit reduced to 20 tons effective Feb 24BUS ROUTE 3 — Detour in effect weekdays 7–9 AM via Aspen Ave due to utility work on Elk StSTORM ADVISORY — Snow forecast 4–8 inches overnight · Plows dispatched by 4 AM · Allow extra travel timeROAD CLOSURE — CR 14 (Ridgeline Rd) between MM 4.2 and MM 7.8 closed for culvert replacement through March 14WINTER MAINTENANCE — Chain control in effect on Hwy 9 above 7,200 ft · Carry traction devicesPERMIT OFFICE — Oversize load permits require 48-hr advance notice · Call (719) 555-0140BRIDGE INSPECTION — Pine Creek Bridge (BR-047) weight limit reduced to 20 tons effective Feb 24BUS ROUTE 3 — Detour in effect weekdays 7–9 AM via Aspen Ave due to utility work on Elk StSTORM ADVISORY — Snow forecast 4–8 inches overnight · Plows dispatched by 4 AM · Allow extra travel time
All Services Available · No Login Required

County TransportationServices & Resources

Permits, road conditions, bus routes, bridge reports, and public records — organized by urgency, open to everyone.

0 mi
Roads Maintained
0
Fixed-Route Bus Lines
0%
On-Time Bus Performance
0
Permits Issued YTD
0
Bridges Inspected 2025
0.0 hr
Avg Permit Response

Service Directory

All Services— sorted by urgency

RoadsStorm Season

Road Closures & Conditions

Active

Live status of all county road closures, weight restrictions, and surface conditions. Updated by dispatch every 2 hours during storm events.

No FormLive DataStorm Priority

Process Steps

1
Check Live Map

Visit the conditions map for real-time closure polygons and road surface ratings.

2
Sign Up for Alerts

Enter your email or phone to receive push notifications when roads in your area change status.

3
Call Dispatch for Emergencies24/7

For unreported hazards or emergency conditions, call dispatch directly 24/7.

Responsible Contact

Dispatch — Road Operations

(719) 555-0101

Updated Feb 26, 2026 · 00:07 MST

RoadsWinter Active

Snowplow Routes & Priority Map

Active

Interactive map of all 14 plow routes with priority tiers. Tier 1 routes cleared within 4 hours of storm end. Tier 2 within 8 hours. Tier 3 within 24 hours.

Interactive MapGPS TrackingWinter Ops

Process Steps

1
Find Your Route Tier

Enter your address on the plow map to see your tier and estimated clearance time.

2
Track Active Plows

GPS tracker shows plow locations updated every 5 minutes during operations.

3
Report Missed CoverageAfter window

Use the road issue reporter if your route has not been cleared within the tier window.

Responsible Contact

Winter Ops — Road Crew

(719) 555-0102

Updated Nov 1, 2025

Permits

Oversize & Overweight Load Permits

Active

Required for any load exceeding 8'6" wide, 14'0" tall, 65' long, or 80,000 lbs GVW. Annual and single-trip options. 48-hour advance notice required.

TR-210 Form$25 / $15048-hr Notice

Process Steps

1
Download Application10 min

Get the TR-210 form. Complete all fields including load dimensions, route, and escort plan.

2
Submit with Fee1 business day

Single-trip: $25. Annual blanket: $150. Submit to permits office or drop box by 3 PM for next-day processing.

3
Receive Permit48 hrs advance required

Permit issued by email or in-person pickup. Must be in cab during transport.

Responsible Contact

Permits Office — Kira Sandoval

(719) 555-0140

Updated Jan 15, 2026

Transit

Fixed-Route Bus Schedule

Active

Current timetables for all 12 fixed routes including Routes 1–9 (town service) and Routes 10–12 (rural connectors). Real-time arrival data available.

12 RoutesReal-TimeFree Transfer

Process Steps

1
Find Your Route

Use the route map or search by stop name. Routes 1–9 run Mon–Sat 6 AM – 9 PM. Routes 10–12 Mon–Fri only.

2
Check Real-Time Arrivals

Text your stop ID to 55555 or use the live tracker for next arrival within 2 minutes.

3
Plan Connections8 min transfer

All routes connect at the Transit Center on Elk Ave. Transfer window is 8 minutes.

Responsible Contact

Transit Operations — Dispatch

(719) 555-0150

Updated Feb 1, 2026

RoadsHigh Demand

Culvert Replacement Requests

Delayed

Request inspection and replacement of county-maintained culverts affecting drainage on private access roads. Average project timeline: 6–18 months depending on funding cycle.

TR-340 FormEngineering ReviewFunding Cycle

Process Steps

1
Submit Request Form15 min

Complete form TR-340. Include GPS coordinates and photos of current culvert condition.

2
Engineering Inspection30 days

County engineer schedules field inspection within 30 days of receipt.

3
Priority Queue Placement60 days

Projects scored by structural risk, traffic volume, and drainage impact. High-risk projects fast-tracked.

4
Construction Scheduling6–18 months

Funding and scheduling confirmed. Typical construction window: April–October.

Responsible Contact

Engineering — Dale Kirchner, P.E.

(719) 555-0120

Updated Oct 12, 2025

Engineering

Bridge Inspection Reports

Active

Public access to all biennial bridge inspection reports for 62 county-maintained structures. Current weight restrictions and structural ratings included.

62 StructuresNBI FormatPublic Record

Process Steps

1
Search by Structure ID

Each bridge has a BR-XXX identifier posted on the structure. Search by ID or location.

2
Download Inspection Report

Full NBI-format inspection reports available as PDF. No account required.

3
Report ConcernsImmediate

Observed structural changes or damage? Call engineering directly — do not wait for the next inspection cycle.

Responsible Contact

Bridge Engineering — Marcus Osei, P.E.

(719) 555-0121

Updated Feb 10, 2026

Permits

Driveway Access Permits

Active

Required before any new driveway, field access, or approach is constructed off a county road. Includes culvert sizing review. No fee for agricultural access.

TR-180 FormFree Ag AccessCulvert Spec Included

Process Steps

1
Download TR-180 Form

Include site plan showing driveway location relative to road centerline and property lines.

2
Engineering Review10 business days

Sight distance and drainage review completed within 10 business days.

3
Permit Issued90-day window

Approved permit includes culvert size specification. Construction must begin within 90 days.

Responsible Contact

Permits Office — Kira Sandoval

(719) 555-0140

Updated Jan 3, 2026

Permits

Road Use Agreements (Heavy Haul)

Active

Required for contractors and energy operators planning sustained heavy haul operations (>30 trips) on county roads. Includes baseline road condition survey and bond.

Bond RequiredPre-App MeetingEnergy Sector

Process Steps

1
Pre-Application MeetingRequired first

Required before form submission. Schedule with engineering to review route and bond calculation.

2
Baseline Road Survey5–10 days

County photographs and rates road condition before operations begin. Cost shared by applicant.

3
Bond & Agreement Execution2–4 weeks

Bond amount based on road class and estimated trip volume. Agreement signed before first haul.

4
Post-Haul Inspection30 days post-ops

Road re-rated after operations. Bond released or applied to repairs within 30 days.

Responsible Contact

Engineering — Dale Kirchner, P.E.

(719) 555-0120

Updated Dec 1, 2025

Transit

Transit Pass Programs

Active

Monthly, senior (65+), and ADA paratransit passes. Employer bulk pass program available for businesses with 10+ employees. Medicaid transport coordination through county.

$45/MonthSenior DiscountADA Paratransit

Process Steps

1
Choose Pass Type

Monthly: $45. Senior/Disabled: $22. ADA Paratransit: income-based. Employer bulk: contact office.

2
Complete Application

Senior and ADA passes require proof of eligibility. Standard pass available at Transit Center same day.

3
Pick Up or Mail Delivery3 business days

Standard passes available at Transit Center, 204 Elk Ave. Senior/ADA mailed within 3 business days.

Responsible Contact

Transit — Passenger Services

(719) 555-0155

Updated Jan 20, 2026

Maintenance

Fleet Maintenance Logs

Active

Public records of maintenance schedules and completed work orders for all 34 county road and transit vehicles. FOIA-compliant records available same day.

34 VehiclesFOIA CompliantSame-Day Available

Process Steps

1
Identify Vehicle or Date Range

Records indexed by vehicle ID, service date, and work type. Specify in your request.

2
Submit Records Request

Complete TR-FOIA-01 or request in person. No fee for records under 50 pages.

3
Receive Records5 business days

Standard FOIA response within 5 business days. Expedited available for legal proceedings.

Responsible Contact

Fleet Manager — Tony Reinholt

(719) 555-0130

Updated Feb 25, 2026

Public Records

Public Meeting Minutes & Agendas

Active

All Transportation Advisory Board meeting minutes, agendas, and recorded votes. Meetings held second Tuesday of each month at 6:00 PM. Next meeting: March 11, 2026.

Monthly MeetingsPublic Comment2018–Present Archive

Process Steps

1
View Meeting Archive

All minutes from 2018–present available as PDF. Searchable by date and agenda item.

2
Attend or Submit Comment

Public comment period at start of each meeting. Written comments accepted until 5 PM day-of.

3
Request Agenda Items14 days ahead

Submit agenda item requests to the board secretary at least 14 days before meeting.

Responsible Contact

Board Secretary — Patrice Willoughby

(719) 555-0105

Updated Feb 11, 2026

Public Records

Road Improvement Plans Archive

Archived

Historical and current Capital Improvement Program documents, road design plans, and as-built drawings for county road projects from 2005–present.

2005–PresentAs-Built DrawingsCIP Documents

Process Steps

1
Identify Project

Records indexed by road name, project number, and year. Ask front desk for the index binder.

2
Submit Records Request1–5 days

Large-format drawings require 5 business days for reproduction. Standard documents same day.

Responsible Contact

Engineering Records — Front Desk

(719) 555-0100

Updated Dec 31, 2025

Transparent Process

How This Office Works

Step 1

Find Your Service

Search by service name, form number, or keyword. Filter by category or urgency. Every public document is accessible without an account.

Step 2

Download the Form

Click "Download Form" on any permit or application card. PDF opens immediately — fill it out digitally or print it. No registration, no wait.

Step 3

Submit & Track

Submit in person, by mail, or via the drop box at 114 County Road 1. Track status by calling the contact listed on each service card.

Step 4

Get Notified

Sign up for email alerts on road closures, bridge weight restrictions, and schedule changes. Or check the amber ticker at the top of any page.

All public records, meeting minutes, and permit applications are available at no charge. Walk-in hours: Monday–Friday 7:30 AM – 4:30 PM · Closed county holidays.

Can't find what you need?

Call the main office and someone will point you to the right form, the right person, or the right answer — usually in under three minutes.

Walk-In Hours

Mon–Fri 7:30 AM – 4:30 PM

Phone Support

Mon–Fri 7:00 AM – 5:00 PM

24/7 Dispatch

Road Emergencies Only

Address

114 County Road 1, Suite 200